NORTH COAST – Caltrans reports that the following road projects will be taking place around Lake County during the coming week.
Included are Mendocino County projects that may impact Lake County commuters.
LAKE COUNTY
Highway 20
– Geotechnical surveys will be performed from Old State Highway Road to Howard Street on Thursday, Aug. 5. Work hours are 6 a.m. to 4 p.m. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Fugro West, Incorporated, of
Roseville.
– PG&E of Ukiah has been granted a Caltrans Encroachment Permit for utility maintenance 0.8 mile west of Rosemont Drive through Friday, July 30. Work hours are 9 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays.
– Geotechnical surveys will be performed near Keys Boulevard and from 3.5 miles west of Walker Ridge Road to the Colusa/Lake County line on Monday, August 2. Work hours are 6 a.m. to 4 p.m. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Fugro West Inc. of Roseville.
Highway 29
– Chip sealing from the Lake/Napa County line to Hidden Valley Road will continue. Nighttime work hours are 7 p.m. to 6 a.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays. Contractor – International Surfacing Systems of West
Sacramento.
– Geotechnical surveys will be performed from Central Park Road to 0.8 mile north of Diener Drive on Wednesday, Aug. 4. Work hours are 6 a.m. to 4 p.m. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Fugro West Inc. of Roseville.
– Geotechnical surveys will be performed near Main Street on Thursday, Aug. 5. Work hours are 6 a.m. to 9 a.m. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Fugro West Inc. of Roseville.
– Geotechnical surveys will be performed from 0.2 mile north of Bottle Rock Road to 0.2 mile north of the Hill Creek Bridge on Thursday, Aug. 5. Work hours are 6 a.m. to 4 p.m. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Fugro West Inc. of Roseville.
– Paving from the junction of Route 29/175 near Lakeport to Mockingbird Lane will continue. Work hours are 4 a.m. to 4 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Ramps at Lakeport Boulevard (Exit 102), 11th Street (Exit 103), Park Way (Exit 106), and Nice-Lucerne Cutoff Road (Exit 108) will be intermittently closed. No more than one onramp and offramp will be closed at a time. Motorists will be advised to use an alternate route and may experience minor delays. Contractor – Granite Construction of Ukiah.
Highway 53
– Geotechnical surveys will be performed from 0.4 mile south of Crawford Avenue to 0.2 mile north of Olympic Drive on Tuesday, Aug. 3. Work hours are 6 a.m. to 4 p.m. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Fugro West Inc. of Roseville.
Highway 175
– Geotechnical surveys will be performed from 0.2 mile west of Forestry Station Access Road to 0.5 mile east of Arroyo Vista Road on Tuesday, August 3. Work hours are 6 a.m. to 4 p.m. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Fugro West Inc. of Roseville.
– AT&T of Sacramento has been granted a Caltrans Encroachment Permit for utility maintenance near Maples Shadow Road Monday, Aug. 2, through Wednesday, Aug. 4. Work hours are 9 a.m. to 3 p.m. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays.
– Chip sealing at the junction of Route 29/175 will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays. Contractor – International Surfacing Systems of West Sacramento.
Highway 281
– North Bay Construction of Petaluma has been granted a Caltrans Encroachment Permit for paving on Soda Bay Road through Friday, July 30. Work hours are 7 a.m. to 4 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
MENDOCINO COUNTY
Highway 1
– Paving from the Albion River Bridge to Jackson Street will continue. Work hours are 7 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays. Contractor – Granite Construction of Ukiah.
– Pavement repairs at Blue Slide Gulch, just south of Westport, will continue. Work hours are 8 a.m. to 4 p.m. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Mercer-Fraser of Eureka.
– A drainage repair project from 1.4 miles south of Hales Grove to 1.2 mile south of Mill Bank Resort will continue. Work hours are 7 a.m. to 3:30 p.m., weekdays. One-way traffic control will be in effect 24 hours per day, seven days per week. Motorists should anticipate 15-minute delays. Contractor – Green Right O’Way Constructors of Willits.
Highway 101
– Installation of rock slope protection from Reeves Canyon Road to the Haehl Overhead bridge will continue. Work hours are 7 a.m. to 3 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Granite Construction of Ukiah.
– A highway restriping and signing project from Reynolds Highway to 1.2 miles north of Ryan Creek Road will continue through Friday, July 30. Work hours are 7 a.m. to 7 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. Contractor – Apply-A-Line Inc. of Anderson.
– Paving from the Dora Creek Bridge to 0.5 mile north of the Dora Creek Bridge will continue through Friday, July 30. Work hours are 6 a.m. to 6 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Mendocino Construction Services Inc. of Willits.
Highway 162
– A bridge widening project at Outlet Creek Bridge will continue through Friday, July 30. Work hours are 7 a.m. to 4 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays. Contractor – Viking Construction Co. Inc. of Rancho Cordova.
– Storm damage repair east of Sand Bank Creek will continue. Work hours are 7 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Contractor – Granite Construction of Ukiah.
Highway 222
– Replacement of the Russian River Bridge will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate 15-minute delays during work hours and five-minute delays at other times. Contractor – CC Myers of Rancho Cordova.
Highway 253
– A bridge widening project at Anderson Creek Bridge will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Viking Construction Co. Inc. of Rancho Cordova.
– Construction of a retaining wall from Singley Cattlepass to the Soda Creek Bridge will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. Contractor – Mendocino Construction Services of Willits.
– A bridge widening project at Soda Creek Bridge will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Viking Construction Co. Inc. of Rancho Cordova.
– A storm repair project from 0.8 mile east of the Soda Creek Bridge to Butler Ranch will continue. Work hours are 7 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Mendocino Construction Services of Willits.
For information pertaining to emergency roadwork or for updates to scheduled roadwork, please contact the California Highway Information Network (CHIN) at 1-800-GAS-ROAD (1-800-427-7623).