NORTH COAST – Caltrans reports that the following road projects will be taking place around Lake County during the coming week.
Included are Mendocino County projects that may impact Lake County commuters.
LAKE COUNTY
Highway 20
– A pavement repair project from the junction of Routes 20/53 to the North Fork Cache Creek Bridge will resume Monday, Aug. 15. Work hours are 6 a.m. to 8 p.m., weekdays. In two-lane sections, one-way traffic control will be in effect and motorists should anticipate 15-minute delays. In three-lane sections, traffic will be restricted to one lane in each direction of travel and motorists may experience minor traffic slowdowns. Contractor – Argonaut Constructors of Santa Rosa.
Highway 29
– A pavement repair project from the Lake/Napa County line to Spruce Grove Road began Friday, Aug. 12. Work hours are 7 a.m. to 3:30 p.m. A shoulder closure will be in effect, and motorists may experience minor traffic slowdowns. Beginning Sunday, Aug. 14, nighttime work hours will be 8 p.m. to 6 a.m., Sunday evening through Friday morning. One-way traffic control will be in effect, and motorists should anticipate 10-minute delays. Contractor – Granite Construction of Ukiah.
– AT&T of Sacramento has been issued a Caltrans Encroachment permit for utility repairs from Wardlaw Street to 0.2 mile north of Saint Helena Lane beginning Monday, Aug. 15. Work hours are 8 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
– Bridge deck repairs at the Scotts Creek Bridge will continue. Work hours are 6:30 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Wahlund Construction of Eureka.
Highway 53
– Highway widening from 40th Avenue to Old Highway 53 north will continue. Work hours are 6 a.m. to 6 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Sierra Equipment Rental of Glenn.
Highway 175
– Metal be a.m. guardrail repair from 2.7 to 4.9 miles east of the Mendocino/Lake County line will continue. Work hours are 6 a.m. to 6 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. Contractor – Stewart Dirt and Aggregate of Fairfield.
– Caltrans will perform routine maintenance from the junction of Routes 29/175 near Kelseyville to Road 4 beginning Tuesday, Aug. 16. Work hours are 8 a.m. to 3:30 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays.
Highway 281
– AT&T of Santa Rosa has been issued a Caltrans Encroachment permit for utility repairs just west of the junction of Routes 29/181 beginning Monday, Aug. 15. Work hours are 8 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
MENDOCINO COUNTY
Highway 1
– Caltrans will perform routine maintenance from Curley Lane to Elk through Tuesday, Aug. 16. Work hours are 6:30 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays.
– Installation of a roundabout at Simpson Lane will continue. Nighttime work hours are 7 p.m. to 7 a.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. Contractor – Fedco Construction Inc., of Santa Rosa.
– Storm damage repairs near the Union Landing Viaduct will continue. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate five-minute delays. Contractor – Valentine Corporation of San Rafael.
– Bridge painting on the South Fork Eel River Bridge will continue. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate five-minute delays. Contractor – NY Blastco of Gardenia.
Highway 20
– Highway widening from 2.3 to 3.3 miles east of Gravel Pit Road will continue. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate five-minute delays. Contractor – Team Ghilotti Inc. of Petaluma.
Highway 101
– Bridge deck repairs at the Russian River Bridge just south of Geysers Road will continue through Tuesday, Aug. 16. Work hours are 6:30 a.m. to 3:30 a.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Wahlund Construction of Eureka.
Highway 101
– Installation of metal be a.m. guardrail at various locations from just north of the Mendocino/Sonoma County Line to the junction of Routes 101/222 will continue. Work hours are 6:30 a.m. to 7 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Jeff Parrish of Stanton.
– Slide repairs north of the Korean War Veterans War Memorial Bridge will continue. Traffic will be restricted to one lane in each direction of travel 24 hours per day, seven days per week. Motorists may experience minor traffic slowdowns. Contractor – Argonaut Constructors of Santa Rosa.
– Caltrans will perform routine maintenance from Hewlitt and Sturtevant Road to Nelson Road beginning Monday, Aug. 15. Work hours are 8 a.m. to 4 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
– Installation of cable median barrier from the El Roble Overcrossing to the junction of Routes 20/101 will continue. Work hours are 7 a.m. to 4 p.m. and 7 p.m. to 7 a.m., Sunday evening through Friday afternoon. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Ghilotti Brothers of San Rafael.
– A pavement repair project from the Robinson Creek Bridge to Uva Drive will continue. Work hours are 5 a.m. to 3 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Granite Construction, Incorporated, of Ukiah.
– Installation of metal be a.m. guardrail and concrete median barrier at the North State Street northbound onramp will continue through Friday, August 12. Work hours are 6 a.m. to 6 p.m., weekdays. A full closure of the northbound onramp will be in effect. Motorists are advised to use an
alternate route. Contractor – Granite Construction of Ukiah.
– Bridge deck repairs at the York Creek Bridge will begin Wednesday, Aug. 17. Work hours are 6:30 a.m. to 4 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Wahlund Construction of Eureka.
– Metal beam guardrail repair at various locations from Reeves Canyon Road to 0.7 mile south of the junction of Routes 1/101 will continue. Work hours are 6:30 a.m. to 7 p.m., weekdays. In two-lane sections, one-way traffic control will be in effect and motorists should anticipate five-minute delays. In four-lane sections, traffic will be restricted to one lane in each direction of travel and motorists may experience minor traffic slowdowns. Contractor – Wahlund Construction of Eureka.
– Bridge painting at the Long Valley Creek Bridge will continue. Work hours are 6 a.m. to 4 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Certified Coatings Company of Fairfield.
– PG&E of Eureka has been issued a Caltrans Encroachment permit for utility repairs 0.4 mile north of Standish Hickey State Park and 1.0 mile south of the Dora Creek Bridge on Monday, Aug. 15. Work hours are 8 a.m. to 3 p.m.. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
– Caltrans will perform routine maintenance from 0.6 mile south of the Bear Pen Undercrossing to the Humboldt/Mendocino County line. Work hours are 7 a.m. to 4:30 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns.
Highway 128
– A pavement repair project from the junction or Routes 1/128 to the Flynn Creek Bridge will begin Friday, Aug. 12. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Argonaut Constructors of Santa Rosa. LC#C128PA
– A pavement repair project from 0.9 mile west of the Mill Creek Bridge to 0.7 mile east of Philo will continue. Work hours are 5 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 20-minute delays. Contractor – Granite Construction, Incorporated, of Ukiah.
– Culvert repairs from 0.6 to 1.3 miles east of Mountain House Road will continue. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate 5-minute delays. Contractor – Team Ghilotti of Petaluma.
Highway 162
– A pavement repair project from the Rodeo Creek Bridge to Sand Bank Creek will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays. Contractor – Mendocino Construction Services of Willits.
– PG&E of Eureka has been issued a Caltrans Encroachment permit for utility repairs near Logan Road beginning Monday, Aug. 15. Work hours are 7 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
Highway 222
– Replacement of the Russian River Bridge will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate 15-minute delays during work hours and five-minute delays at other times. Contractor – CC Myers of Rancho Cordova.
Highway 253
– Culvert repairs from the junction of Routes 128/253 to the junction of Routes 101/253 will continue. Work hours are 7 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays. Contractor – Team Ghilotti of Petaluma.
Work on all these projects is weather permitting and subject to change. Caltrans advises motorists to drive with caution when approaching work areas and to be prepared to stop at traffic control stations.
The Caltrans Traffic Operations Office has reviewed each project and determined that individual project delays are expected to be less than the statewide policy maximum of 30 minutes, unless noted otherwise above.
For information pertaining to emergency roadwork or for updates to scheduled roadwork, please contact the California Highway Information Network (CHIN) at 1-800-GAS-ROAD (1-800-427-7623).