NORTH COAST – Caltrans reports that the following road projects will be taking place around Lake County during the coming week.
Included are Mendocino County projects that may impact Lake County commuters.
LAKE COUNTY
Highway 20
– The county of Lake has been granted a Caltrans Encroachment Permit for sewer repairs from 0.3 mile west of Red Hill Lane to Nice-Lucerne Cuttoff Road. Work hours are 9 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays.
– The county of Lake has been granted a Caltrans Encroachment Permit for the construction of Alpine Park through Friday, Dec. 23. Work hours are 8 a.m. to 3 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns.
Highway 29
– Pavement repairs from the Lake/Napa County line to Hidden Valley Road will continue Tuesday, Dec. 28, and Wednesday, Dec. 29. Work hours are 7 a.m. to 6 p.m. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays. Contractor – International Surfacing Systems of West Sacramento.
MENDOCINO COUNTY
Highway 1
– PG&E of Eureka has been granted a Caltrans Encroachment Permit for utility maintenance 4.0 miles south of Elk on Wednesday, Dec. 29. Work hours are 8:30 a.m. to 3:30 p.m. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays.
Highway 101
– A metal beam guardrail repair project at various locations from the El Roble Overcrossing to 2.3 miles north of Reeves Canyon Road will continue. Work hours are 6:30 a.m. to 7 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. The southbound offramp to Route 222 (Talmage Road Exit 548A) will be intermittently closed from 10 p.m. to 7 a.m., Sunday evening through Friday morning. Motorists will be advised to use an alternate route and may experience minor delays. Contractor – Wahlund Construction of Eureka.
– A metal beam guardrail repair project at various locations from 2.2 miles south of Ridgewood Ranch Road to the Haehl Overhead will continue. Work hours are 6:30 a.m. to 7 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Wahlund Construction of Eureka.
– A metal beam guardrail repair project at various locations from Big Trails Drive to the northern Long Valley Creek Bridge will continue. Work hours are 6:30 a.m. to 7 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Wahlund Construction of Eureka.
– Pavement striping from 0.1 mile south of Harwood Road to 2.5 miles south of Rattlesnake Summit will continue. Work hours are 7 a.m. to 5 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Mercer-Fraser Company of Eureka.
– A metal beam guardrail repair project at various locations from the Cummings Road Overcrossing to 0.6 mile south of the junction of Route 101/271 near Reynolds will continue. Work hours are 6:30 a.m. to 7 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Wahlund Construction of Eureka.
– PG&E of Eureka has been granted a Caltrans Encroachment Permit for utility maintenance 1.0 mile south of the Dora Creek Bridge on Tuesday, Dec. 28. Work hours are 9 a.m. to noon. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
Highway 222
– Replacement of the Russian River Bridge will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate 15-minute delays during work hours and five-minute delays at other times. Contractor – CC Myers of Rancho Cordova.
Please keep in mind work on all these projects is weather permitting and subject to change. Caltrans wishes to advise motorists to drive with caution when approaching work areas and to be prepared to stop at traffic control stations.
The Caltrans Traffic Operations Office has reviewed each project and determined that individual project delays are expected to be less than the statewide policy maximum of 30 minutes, unless noted otherwise above.
For information pertaining to emergency roadwork or for updates to scheduled roadwork, please contact the California Highway Information Network (CHIN) at 1-800-GAS-ROAD (1-800-427-7623).