- Editor
- Posted On
Caltrans plans major roadwork through June 18
NORTH COAST – Caltrans reports that the following road projects will be taking place around Lake County during the coming week.
Included are Mendocino County projects that may impact Lake County commuters.
LAKE COUNTY
Highway 20
– A highway widening project from Government Street to Rancheria Road will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate
20-minute delays. Contractor – Argonaut Constructors of Santa Rosa.
– Caltrans will continue routine maintenance from Ogden Road to Island Drive. Work hours are 8:30 a.m. to 3:30 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate
10-minute delays.
– AT&T of Ukiah has been granted a Caltrans Encroachment Permit for utility repairs 0.5 mile west of Gladys Street beginning Tuesday, June 16. Work hours are 9 a.m. to 3 p.m., weekdays. Intermittent
one-way traffic control will be in effect. Motorists should anticipate five-minute delays.
– A roadway realignment project from 1.4 miles east of the North Fork Cache Creek Bridge to 1.6 miles west of Walker Ridge Road will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. Contractor – Argonaut Constructors of Santa Rosa.
Highway 29
– Bridge deck repairs at Kelseyville Creek Bridge will continue. Work hours are 7 p.m. to 7 a.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays.
Contractor – DeBruin Construction, Incorporated, of Stockton.
Highway 175
– Caltrans will perform routine maintenance from the junction of Route 29/175 near Kelseyville to Salmina resort beginning Tuesday, June 16. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays.
– PG&E of Eureka has been granted a Caltrans Encroachment Permit for pole replacement near Road 4 beginning Thursday, June 18. Work hours are 8 a.m. to 3 p.m., weekdays. One-way traffic control
will be in effect. Motorists should anticipate five-minute delays.
MENDOCINO COUNTY
Highway 1
– Malan and Karen Sjolund of Manchester have been granted a Caltrans Encroachment Permit to install a road approach near Creamery Lane beginning Monday, June 15. Work hours are 9 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
– Construction of a retaining wall about three miles north of Elk will continue. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should
anticipate 10-minute delays. Contractor – Granite Construction of Ukiah.
– Helen O’Neal of Fort Bragg has been granted a Caltrans Encroachment Permit to install a driveway near Simpson Lane. Work hours are 7 a.m. to 5 p.m., weekdays. A shoulder closure will be in effect. Motorists are advised to drive with caution through the area and may experience minor traffic slowdowns.
– The city of Fort Bragg has been granted a Caltrans Encroachment Permit for sidewalk and sewer upgrades from Walnut Street to Pine Avenue. Work hours are 7 a.m. to 3 p.m., weekdays. Southbound traffic will be restricted to one lane. Motorists may experience minor traffic slowdowns.
– Replacement of Ten Mile River Bridge will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect 24 hours per day. Motorists should anticipate 10-minute delays. Contractor – Golden State Bridge of Martinez.
– Baile Oakes of Westport has been granted a Caltrans Encroachment Permit to pave a road approach 1.5 miles north of Blue Slide Gulch. Work hours are 8 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
– Storm damage repair about nine miles north of Hardy Creek Bridge will continue. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists
should anticipate five-minute delays. Contractor – Maggiora and Ghilotti Inc. of San Rafael.
Highway 101
– Storm damage repair from 0.6 mile to .8 mile north of Comminsky Station Road will continue. Northbound traffic will be restricted to one lane 24 hours per day, seven days per week. Motorists may
experience minor traffic slowdowns. Contractor – Mendocino Construction Services of Willits.
– Bridge deck repairs at the Hopland Overhead Bridge will continue Wednesday, June 17. Work hours are 7 p.m. to 7 a.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays. Contractor – DeBruin Construction Inc. of Stockton.
– A pavement repair project from the West Road Overcrossing to Moore Avenue will continue. Southbound traffic will be restricted to one lane 24 hours per day, from midnight Sunday to 3 p.m. Friday. Motorists may experience minor traffic slowdowns. Contractor – Professional Concrete Services of Pleasant Hill.
– Roadway repair due to pavement deterioration and a slipout from 1.1 miles north of Reeves Canyon Road to 0.5 mile south of Ridgewood Ranch Road will continue. Traffic will be restricted to one lane
in each direction of travel 24 hours per day, seven days per week. Motorists may experience minor traffic slowdowns. Contractor – North Bay Construction of Petaluma.
– The city of Willits has been granted a Caltrans Encroachment Permit for utility repairs from Evergreen Shopping Center to Shell Road through Friday, June 12. Work hours are 8 a.m. to 3 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns.
– Caltrans will perform routine maintenance from Casteel Lane to Big Trails Drive beginning Monday, June 15. Work hours are 7:30 a.m. to 3:30 p.m., weekdays. One-way traffic control will be in effect.
Motorists should anticipate 10-minute delays.
– A pavement repair project from the Big Trails Drive to the Arnold Overhead Bridge will begin Monday, June 15. Work hours are 6 a.m. to 6 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Windsor Fuel Co. of Pittsburg.
– A pavement repair project at the Long Valley Creek Bridge will begin Monday, June 15. Work hours are 6 a.m. to 6 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Windsor Fuel Co. of Pittsburg.
Highway 128
– Sierra Nevada World Music Festival of Ryde has been issued a Caltrans Encroachment permit to hold a festival from the Caltrans Maintenance Station to Hutsell Road beginning Thursday, June 18. A
shoulder closure will be in effect from 9 a.m. to 3 p.m. Motorists are advised to drive with caution through the area and may experience minor traffic slowdowns.
– AT&T of Walnut Creek has been granted a Caltrans Encroachment Permit for utility work from the Dry Creek Bridge to 1.6 miles east of Dry Creek Bridge beginning Friday, June 12. Work hours are 7 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
Highway 162
– PG&E of Eureka has been granted a Caltrans Encroachment Permit for tree trimming from Sand Bank Creek to the Short Creek Bridge beginning Monday, June 15. Work hours are 8 a.m. to 4 p.m.,
weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
Highway 175
– PG&E of Eureka has been granted a Caltrans Encroachment Permit for pole replacement between Harrison Street and Wooldrige Ranch Road on Friday, June 12. Work hours are 8 a.m. to 3 p.m. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
Highway 271
– Kiwanis of the Redwoods of Piercy has been granted a Caltrans Encroachment Permit for the annual Redwood Run from Friday, June 12 through Monday, June 15. Route 271 will be restricted to local traffic only.
For information pertaining to emergency roadwork or for updates to scheduled roadwork, please contact the California Highway Information Network (CHIN) at 1-800-GAS-ROAD (1-800-427-7623).