NORTH COAST – Caltrans reports that the following road projects will be taking place around Lake County during the coming week.
Included are Mendocino County projects that may impact Lake County commuters.
LAKE COUNTY
Highway 20
– Caltrans will perform routine maintenance from Bachelor Valley Road to the Middle Creek Bridge beginning Monday, Oct. 11. Work hours are 8 a.m. to 3:30 p.m., Monday through Thursday. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays.
– The County of Lake has been granted a Caltrans Encroachment Permit for utility maintenance near Alpine Park. Work hours are 7 a.m. to 4 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns.
MENDOCINO COUNTY
Highway 1
– AT&T of Sacramento has been granted a Caltrans Encroachment Permit for utility maintenance from the Garcia River Bridge to 0.4 mile north of Stonebord Road Monday, Oct. 11, through Wednesday, Oct. 13. Work hours are 7 a.m. to 4 p.m. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
– Replacement of signal heads from the junction of Routes 1/20 to Manzanita Street will continue. Work hours are 7 a.m. to 4 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. Contractor – Republic ITS of Novato.
– Bridge deck repairs at the Union Landing Viaduct will continue. Work hours are 7 a.m. to 4 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Peterson-Chase General Engineering Construction Inc. of Irvine.
Highway 101
– A metal beam guardrail repair project at various locations from 0.1 mile north of the Mendocino/ Sonoma County line to Ukiah will continue. Nighttime work hours are 5 p.m. to 7 a.m., Sunday evening through Friday morning. In four-lane sections traffic will be restricted to one lane in each direction of travel, and motorists may experience minor traffic slowdowns. In two-lane sections one-way traffic control will be in effect, and motorists should anticipate 10-minute delays. Contractor – Wahlund Construction of Eureka.
– A metal beam guardrail repair project at various locations from the South Ukiah Overhead to 1.0 mile north of Reynolds Highway will continue. In four-lane sections work hours are 24 hours per day from 5 p.m. Sunday through 7 a.m. Friday. Traffic will be restricted to one lane in each direction of travel, and motorists may experience minor traffic slowdowns. In two-lane sections nighttime work hours are 5 p.m. to 7 a.m., Sunday evening through Friday morning. One-way traffic control will be in effect, and motorists should anticipate 10-minute delays. Contractor – Wahlund Construction of Eureka.
– A pavement repair project from Lake Mendocino Drive to Moore Avenue will continue. Work hours are 8 p.m. to 3 p.m., Sunday evening through Friday afternoon. Northbound traffic will be restricted to one lane. Motorists may experience minor traffic slowdowns. Ramps at Lake Mendocino Drive (Exit 552) will be intermittently closed. Motorists will be advised to use an alternate route and may experience minor delays. Contractor – Granite Construction Inc. of Ukiah.
– Culvert repairs just north of Reeves Canyon Road will continue. Work hours are 8 a.m. to 5 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Granite Construction Inc. of Ukiah.
– Pavement repairs from Steel Lane to 0.6 mile south of Rattlesnake Summit will continue. Work hours are 7 a.m. to 7 p.m., weekdays. In four-lane sections traffic will be restricted to one lane in each direction of travel, and motorists may experience minor traffic slowdowns. In two-lane sections one-way traffic control will be in effect, and motorists should anticipate 10-minute delays. Contractor – Mercer-Fraser Co. of Eureka.
– A metal beam guardrail repair project at various locations from the Rock reek Bridge to the Bridges Creek Bridge will continue. In four-lane sections work hours are 24 hours per day from 5 p.m. Sunday evening through 7 a.m. Friday morning. Traffic will be restricted to one lane in each direction of travel, and motorists may experience minor traffic slowdowns. In two-lane sections nighttime work hours are 5 p.m. to 7 a.m., Sunday evening through Friday morning. One-way traffic control will be in effect, and motorists should anticipate 10-minute delays. Contractor – Wahlund Construction of Eureka.
Highway 222
– Replacement of the Russian River Bridge will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate 15-minute delays during work hours and five-minute delays at other times. Contractor – CC Myers of Rancho Cordova.
For information pertaining to emergency roadwork or for updates to scheduled roadwork, please contact the California Highway Information Network (CHIN) at 1-800-GAS-ROAD (1-800-427-7623).