Saturday, 30 November 2024

Community

NICE, Calif. – Come enjoy a family-style dinner and dance on Saturday, Aug. 27, at the Sons of Italy.


The group will have chicken cacciatore, egg noodles, green beans, fresh cut salad, French bread and homemade cake for dessert.


Dinner will be served at the club hall, 2817 E. Highway 20 in Nice.


The bar is open for socializing at 5 p.m. then dinner will be served at 6 p.m.


Enjoy dancing to the music of the High Notes right after the meal.


All tickets cost $15 at the door.


Everyone is welcome.


For information about this event or renting the hall for your own, call 707-274-2244.

Image
This image was created by artist Lisa Kaplan and photographer Emily Slavens, in collaboration with students at Lake County International Charter School in Middletown, Calif. Its message is,

NORTH COAST – Caltrans reports that the following road projects will be taking place around Lake County during the coming week.


Included are Mendocino County projects that may impact Lake County commuters.


LAKE COUNTY


Highway 20


– A pavement repair project from the junction of Highways 20/53 to the North Fork Cache Creek Bridge will continue. Work hours are 5 a.m. to 8 p.m., weekdays. In two-lane sections, one-way traffic control will be in effect and motorists should anticipate 15-minute delays. In three-lane sections, traffic will be restricted to one lane in each direction of travel and motorists may experience minor traffic slowdowns. Contractor – Argonaut Constructors of Santa Rosa.


– Tony's Fine Foods of West Sacramento has been issued a Caltrans Encroachment permit for spill cleanup about 1.3 miles west of the North Fork Cache Creek Bridge beginning Monday, Aug. 29. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.


Highway 29


– A pavement repair project from the Lake/Napa County line to Spruce Grove Road will continue. Nighttime work hours are 6 p.m. to 7 a.m., Sunday evening through Friday morning. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays. Contractor – Granite Construction of Ukiah.


– AT&T of Santa Rosa has been issued a Caltrans Encroachment permit for utility repairs near the junction of Routes 29/281 through Friday, Aug. 26. Work hours are 7 a.m. to 4 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.


Highway 53


– Highway widening from Olympic Drive to the junction of Highways 20/53 will continue. Work hours are 6 a.m. to 6 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays. Contractor – Sierra Equipment Rental of Glenn.


Highway 175


– Caltrans will perform routine maintenance from 0.3 mile east of the junction of Routes 29/175 near Kelseyville to 1.1 miles west of Diener Road. Work hours are 8 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays.


– Caltrans will perform routine maintenance from 0.2 mile east Loch Lomond Road to Ad a.m. Springs Road (east) on Tuesday, Aug. 30, and Wednesday, Aug. 31. Work hours are 8 a.m. to 4:30 p.m. Intermittent full road closures will be in effect. Motorists should anticipate 20-minute delays.


– A pavement repair project from the junction of Routes 29/175 in Middletown to the junction of Routes 29/175 in Kelseyville will continue. Work hours are 6 a.m. to 4 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays. Contractor – Granite Construction of Ukiah.


Highway 281


– AT&T of Santa Rosa has been issued a Caltrans Encroachment permit for utility repairs just west of the junction of Routes 29/181 through Friday, August 26. Work hours are 7 a.m. to 4 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.


MENDOCINO COUNTY


Highway 1


– AT&T of Eureka has been issued a Caltrans Encroachment permit for utility repairs from Old State Highway to Sedalia Drive. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.


– PG&E of Eureka has been issued a Caltrans Encroachment permit for utility maintenance near Gualala on Wednesday, Aug. 31. Work hours are 7 a.m. to 8 a.m. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. LC#P1IA


– Caltrans will perform routine maintenance at various locations from Gualala to Leggett. Work hours are 8 a.m. to 4 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.


– Installation of a roundabout at Simpson Lane will continue. Nighttime work hours are 7 p.m. to 7 a.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. Contractor – Fedco Construction, Inc., of Santa Rosa.


– Culvert repairs 0.8 mile north of Ward Avenue will continue. Work hours are 7 a.m. to 4 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. Contractor – Ka-Pel Construction of Willow Creek.


– Storm damage repairs near the Union Landing Viaduct will continue. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate five-minute delays. Contractor – Valentine Corporation of San Rafael.


Highway 20


– Highway widening from 2.3 to 3.3 miles east of Gravel Pit Road will continue. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate five-minute delays. Contractor – Team Ghilotti Inc. of Petaluma.


Highway 101


– Installation of metal be a.m. guardrail at various locations from just north of the Mendocino/Sonoma County Line to the junction of Routes 101/222 will continue. Work hours are 6:30 a.m. to 7 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. Contractor – Jeff Parrish of Stanton.


– Slide repairs north of the Korean War Veterans War Memorial Bridge will continue. Traffic will be restricted to one lane in each direction of travel 24 hours per day, seven days per week. Motorists may experience minor traffic slowdowns. Contractor – Argonaut Constructors of Santa Rosa.


– Installation of cable median barrier from the El Roble Overcrossing to the junction of Routes 20/101 will continue. Work hours are 7 a.m. to 3 p.m. and 7 p.m. to 7 a.m., Sunday evening through Friday

afternoon. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Ghilotti Brothers of San Rafael.


– A pavement repair project from the Robinson Creek Bridge to Uva Drive will continue. Work hours are 8 p.m. to 6 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Granite Construction Inc. of Ukiah.


– Bridge deck repairs at the Lake Mendocino Drive Undercrossing, the York Creek Bridge, and the Pomo Lane Undercrossing will begin Monday, August 29. Work hours are 6 p.m. to 6 a.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Wahlund Construction of Eureka.


– Installation of metal be a.m. guardrail at various locations from Reeves Canyon Road to the South Willits Overhead will continue. Work hours are 6 a.m. to 5 p.m., weekdays. Southbound traffic will be restricted to one lane. Motorists may experience minor traffic slowdowns. Contractor – Jeff Parrish of Stanton.


– Metal beam guardrail repair at various locations from Reeves Canyon Road to 0.7 mile south of the junction of Routes 1/101 will continue. Work hours are 6:30 a.m. to 7 p.m., weekdays. In two-lane sections, one-way traffic control will be in effect and motorists should anticipate five-minute delays. In four-lane sections, traffic will be restricted to one lane in each direction of travel and motorists may experience minor traffic slowdowns. Contractor – Wahlund Construction of Eureka.


– Caltrans will perform routine maintenance from Walker Road to the Willits Mill Creek Bridge. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays.


– Bridge painting at the Long Valley Creek Bridge will continue. Work hours are 6 a.m. to 4 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns. Contractor – Certified Coatings Co. of Fairfield.


– Caltrans will perform routine maintenance from 0.6 mile south of the Bear Pen Undercrossing to the Humboldt/Mendocino County line. Work hours are 7 a.m. to 4:30 p.m., weekdays. Traffic will be restricted to one lane in each direction of travel. Motorists may experience minor traffic slowdowns.


Highway 128


– A pavement repair project from the junction of Highway 1/128 to the Flynn Creek Bridge will continue. Work hours are 6 a.m. to 8 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Argonaut Constructors of Santa Rosa.


– A pavement repair project from the Mill Creek Bridge the Indian Creek Bridge will continue. Work hours are 6 a.m. to 4 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. Contractor – Granite Construction Inc. of Ukiah.


– Culvert repairs from 0.6 to 1.3 miles east of Mountain House Road will continue. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate five-minute delays. Contractor – Team Ghilotti of Petaluma.


Highway 222


– Replacement of the Russian River Bridge will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate 15-minute delays during work hours and five-minute delays at other times. Contractor – CC Myers of Rancho Cordova.


Highway 253


– Culvert repairs from the junction of Routes 128/253 to the junction of Routes 101/253 will continue. Work hours are 7 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 15-minute delays. Contractor – Team Ghilotti of Petaluma.


– PG&E of Eureka has been issued a Caltrans Encroachment permit for utility repairs near Stipp Lane beginning Thursday, Sept. 1. Work hours are 9 a.m. to 1 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.


Work on all these projects is weather permitting and subject to change. Caltrans wishes to advise motorists to drive with caution when approaching work areas and to be prepared to stop at traffic control stations.


The Caltrans Traffic Operations Office has reviewed each project and determined that individual project delays are expected to be less than the statewide policy maximum of 30 minutes, unless otherwise noted.


For information pertaining to emergency roadwork or for updates to scheduled roadwork, please contact the California Highway Information Network (CHIN) at 1-800-GAS-ROAD (1-800-427-7623).

LAKE COUNTY, Calif. – The Lake County Doll Club meets on the second Tuesday of the month at selected locations around the lake.


The next meeting will be at 11:30 on Tuesday, Sept. 13.


The group shares dolls, has presentations about special dolls and occasionally gets together with other doll clubs.


The club welcomes new members.


For further information please call Sandi Mekeel at 707-277-0536.

Image
Local produce from Bio Farm of Kelseyville. Courtesy photo.
 

 

 

 


LAKE COUNTY, Calif. – The Lake County Community Co-op announced its all organic modified community supported agriculture boxes were sourced from all local producers this week.


Produce for the boxes this week include organic sweet and hot peppers, cherry tomatoes, new potatoes and purple globe eggplant from Bio Farm in Kelseyville and organic green zucchini from Leonardis Organics in Lakeport.


Additionally, individual items can be purchased from Bio Farm, Dancing Tree People Organics and Leonardis Organics and value added producers, such as Main Street Bakery, Villa Barone and the Wilits grain project through FOODS, the co-op's online ordering system.


The co-op's weekly modified CSA boxes are sourced from local organic growers first, regional organic growers second and organic distributors lastly with attention paid to the source of produce.


Barbara Christwitz, co-op member and Buying Club organizer, was delighted with the news. “Due to our late spring rains this year, most of our growers experienced a challenging and late harvest season. To finally have our boxes completely sourced local, which we haven't been able to do since last Summer, is just exciting. It brings us closer to our vision of a sustainable local food system.”


She further espoused the benefits to the environment, economy and community when the boxes can be sourced solely from Lake County farmers. “Our local producers are doing what they can to increase their variety and lengthen the growing season in Lake County so we can benefit more from their efforts. We wholeheartedly appreciate this effort!”


Additionally, the co-op announced they've displayed drop point signs at the nine drop points around the county to help local residents identify where in their community they can receive co-op deliveries.


The signs, designed by Kathy Wolden, sport the co-op's unmistakable green leaf logo and are seen at Lake County Wine Studio in Upper Lake, the Featherbed Railroad B&B in Nice, Common Grounds Coffee House in the Riviera, Bikram Yoga in Lower Lake, Cobb Mountain Video, Watershed Bookstore in Lakeport and Lovies Garden Emporium in Middletown.


“It's really about community,” said co-op steering committee member Allen Markowski. “We're partnering with local businesses to also help strengthen our local economy, in addition to the work we're doing for the local food system.”

 

The co-op was started in 2007 as a response to the community's desire to create a stronger local food system.


They also sponsor the Friday Night Farmers' Market in Clearlake (5 p.m. to 7 p.m. at Redbud Park), community garden efforts and an educational series through their nonprofit arm, CREATE.


For more information on all of the Co-op and CREATE's endeavors, go to www.lakeco-op.org or call 707-993-4270.

Image
A landscape by Diana Liebe, whose work will be on display at the Lake County Wine Studio in Upper Lake, Calif., in September 2011.


 


LAKE COUNTY, Calif. – Lake County Wine Studio is hosting a wine tasting event featuring new wine releases from Shed Horn Cellars with winemaker Mike and his wife Adawn Wood, and painted works of art and clothing by Diana Liebe in September.


The event will take place Friday, Sept. 2, from 5 p.m. to 8 p.m., and Saturday, Sept. 3, from 4 p.m. to 7 p.m.


Musical guest during the reception evenings is Carey Robinson on acoustic guitar.


Wood continues to reap awards for his wines and the current releases have been no exception with Golds and Silvers won at both the 2011 San Francisco Chronicle Wine Competition and 2011 State Fair.


The $10 wine sampler with paired appetizers will include their 2009 Sauvignon Blanc, 2010 Chardonnay from Robinson Lake Vineyard, 2009 Zinfandel, 2007 Cabernet Sauvignon and 2008 Petite Sirah.


Diana Liebe is the artist on show for the month of September.


A former art teacher at both the high school and college levels, Liebe has been very involved in the Lake County Arts community since moving here from Mendocino County seven years ago.

 

 

 

Image
Artist Diana Liebe owns Serendipity Arts & Boutique located in Lucerne, Calif., at Harbor Village Artist

LCNews

Responsible local journalism on the shores of Clear Lake.

 

Memberships: