NORTH COAST – Caltrans reports that the following road projects will be taking place around Lake County during the coming week.
Included are Mendocino County projects that may impact Lake County commuters.
LAKE COUNTY
Highway 20
– AT&T of Walnut Creek has been granted a Caltrans Encroachment Permit for utility repairs 0.8 mile east of Rosemont Drive beginning Monday, March 7. Work hours are 8 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays.
Highway 29
– Metal be a.m. guardrail repair at the Saint Helena Creek Bridge will continue beginning Tuesday, March 8. Work hours are 8:30 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. Contractor – Stewart Dirt and Aggregate of Fairfield.
– Metal be a.m. guardrail repair at the Coyote Creek Bridge will continue. Work hours are 8:30 a.m. to 3 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays. Contractor – Stewart Dirt and Aggregate of Fairfield. LC#C29IG
MENDOCINO COUNTY
Highway 1
– PG&E of Eureka has been granted a Caltrans Encroachment Permit for tree trimming 0.2 mile north of Airport Road through Friday, March 4. Work hours are 8 a.m. to 4 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
– PG&E of Eureka has been granted a Caltrans Encroachment Permit for tree trimming 2.0 miles south of Blue Slide Gulch through Friday, March 4. Work hours are 8 a.m. to 4 p.m., weekdays. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.
Highway 101
– A pavement repair project from the Robinson Creek Bridge to Uva Drive will continue. Northbound traffic will be restricted to one lane in each direction of travel 4 a.m. to 3 p.m., weekdays. Southbound traffic will be restricted to one lane in each direction of travel 24 hours per day, seven days per week. Motorists may experience minor traffic slowdowns. Northbound ramps at Lake Mendocino Drive (Exit 552), Calpella (Exit 555A), and Route 20 (Exit 555B) as well as southbound ramps at West Road (Exit 557), Route 20 (Exit 555B) and Calpella (Exit 555A) will be intermittently closed. Motorists will be advised to use an alternate route and may experience minor delays. Contractor – Granite Construction Inc. of Ukiah.
– Repair of a slipout from 3.4 to 1.2 miles south of Ridgewood Ranch Road will continue. Traffic will be restricted to one lane in each direction of travel 24 hours per day, seven days per week. Motorists may experience minor traffic slowdowns. Contractor – Granite Construction Inc. of Ukiah.
Highway 222
– Replacement of the Russian River Bridge will continue. Work hours are 7 a.m. to 5 p.m., weekdays. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate 15-minute delays during work hours and five-minute delays at other times. Contractor – CC Myers of Rancho Cordova.
All projects are weather permitting and subject to change. Caltrans wishes to advise motorists to drive with caution when approaching work areas and to be prepared to stop at traffic control stations.
The Caltrans Traffic Operations Office has reviewed each project and determined that individual project delays are expected to be less than the statewide policy maximum of 30 minutes, unless noted otherwise above.
For information pertaining to emergency roadwork or for updates to scheduled roadwork, please contact the California Highway Information Network (CHIN) at 1-800-GAS-ROAD (1-800-427-7623).