Wednesday, 11 December 2024

Community

LUCERNE, Calif. — The Lucerne Alpine Senior Center will be open beginning on Tuesday, Oct. 4.

From 9:30 to 11:30 a.m., the center will be open and serving coffee and snacks to seniors — those age 55 and above — and their caretakers.

The center is located at 3985 Country Club Drive.

For more information, call 707-274-8779.

KELSEYVILLE, Calif. — The Lake County Office of Emergency Services invites the public to learn more about the 2023 Local Hazard Mitigation Plan update at a meeting this week.

The public information meeting will be held at 6 p.m. Thursday, Sept. 29, at the Kelseyville Lions Club, 4335 Sylar Lane.

Hazard mitigation planning forms the foundation for a community long-term strategy to reduce disaster-related losses, by breaking the repeated cycle of disaster damage and reconstruction.

There will be a brief presentation followed by discussion and opportunity for public input and feedback.

Konocti Women’s Service Club Vice President Judy Michaels and Schad Schweitzer, Student and family advocate.

LAKE COUNTY, Calif. — On Sept. 16, the Konocti Women’s Service Club delivered 81 backpacks to the Lakeport Elementary School to help with their school backpack drive.

Schad Schweitzer, student and family advocate of the Lakeport Unified School District organized the backpack fundraiser for the students.

The Konocti Women’s Service Club is a nonprofit organization whose motto is “For Kid’s Sake” and has helped many of the Lake County schools each year with school supply donations as well as scholarships for graduating high school students.

NORTH‌‌ ‌‌COAST, ‌‌ ‌‌Calif. —‌ Caltrans‌‌ ‌‌reports‌‌ ‌‌that‌‌ ‌‌the‌‌ ‌‌following‌‌ ‌‌road‌‌ ‌‌projects‌‌ ‌‌will‌‌ ‌‌be‌‌ ‌‌taking‌‌ ‌‌place‌‌ ‌‌‌around‌‌ ‌‌the‌‌ ‌‌North‌‌ ‌‌Coast‌‌ ‌‌during‌‌ ‌‌the‌‌ ‌‌coming‌‌ ‌‌week. ‌‌ ‌‌‌ ‌
‌‌‌ ‌
Included‌‌ ‌‌are‌‌ ‌‌Mendocino‌‌ ‌‌County‌‌ ‌‌projects‌‌ ‌‌that‌‌ ‌‌may‌‌ ‌‌impact‌‌ ‌‌Lake‌‌ ‌‌County‌‌ ‌‌commuters, as well as work in Del Norte and Humboldt counties.
‌‌‌ ‌
Caltrans‌‌ ‌‌advises‌‌ ‌‌motorists‌‌ ‌‌to‌‌ ‌‌drive‌‌ ‌‌with‌‌ ‌‌caution‌‌ ‌‌when‌‌ ‌‌approaching‌‌ ‌‌work‌‌ ‌‌areas‌‌ ‌‌and‌‌ ‌‌to‌‌ ‌‌be‌‌ ‌‌‌prepared‌‌ ‌‌to‌‌ ‌‌stop‌‌ ‌‌at‌‌ ‌‌traffic‌‌ ‌‌control‌‌ ‌‌stations. ‌‌ ‌‌‌ ‌
‌‌‌ ‌
The‌‌ ‌‌Caltrans‌‌ ‌‌Traffic‌‌ ‌‌Operations‌‌ ‌‌Office‌‌ ‌‌has‌‌ ‌‌reviewed‌‌ ‌‌each‌‌ ‌‌project‌‌ ‌‌and‌‌ ‌‌determined‌‌ ‌‌that‌‌ ‌‌individual‌‌ ‌‌‌project‌‌ ‌‌delays‌‌ ‌‌are‌‌ ‌‌expected‌‌ ‌‌to‌‌ ‌‌be‌‌ ‌‌less‌‌ ‌‌than‌‌ ‌‌the‌‌ ‌‌statewide‌‌ ‌‌policy‌‌ ‌‌maximum‌‌ ‌‌of‌‌ ‌‌30‌‌ ‌‌minutes‌‌ ‌‌unless‌‌ ‌‌‌noted‌‌ ‌‌otherwise. ‌‌ ‌‌‌ ‌‌‌ ‌

For‌‌ ‌‌updates‌‌ ‌‌to‌‌ ‌‌this‌‌ ‌‌list‌‌ ‌‌check‌‌ ‌‌QuickMap‌‌ ‌‌at‌‌ ‌‌‌www.dot.ca.gov‌‌‌ or‌‌ ‌‌1-800-GAS-ROAD‌‌ ‌‌‌(1-800-427-7623). ‌‌ ‌‌‌ ‌

LAKE‌‌ ‌‌COUNTY‌‌ ‌‌‌ ‌

Highway 20

– Utility work in Upper Lake near Pomo Way will begin on Monday, Oct. 3. Lane closures will be in effect from 6:30 a.m. to 4:30 p.m. and motorists should expect minor slowdowns in the area.

— Road work will occur east of the Nice Lucerne Cutoff on Friday, Oct. 7. Lane closures will be in effect from 6:30 a.m. to 5:30 p.m. and motorists should expect minor slowdowns through the area.

— Bridge work in Lucerne from Grove Street to Sixth Street will begin on Monday, Oct. 3. One-way traffic control will be in effect from 6:30 a.m. to 6 p.m. weekdays. Motorists should anticipate up to 10-minute delays.

— Utility work will occur in Lucerne near 13th Street on Tuesday, Oct. 4. One-way traffic control will be in effect from 7:30 a.m. to 4 p.m. Motorists should expect up to five-minute delays.

Highway 29

— Utility work will occur from Hofacker Lane to A Street on Tuesday, Oct. 4. One-way traffic control will be in effect from 7:30 a.m. to 4 p.m. Motorists should expect up to five-minute delays.

— Bridge work at Robinson Rancheria Road continues. One-way traffic control will be in effect. Motorists should anticipate up to 10-minute delays.

Highway 175

— Bridge work in Cobb at Estates Drive will continue. One-way traffic control will be in effect from 6 a.m. to 6 p.m. Motorists should expect up to 10-minute delays.

MENDOCINO COUNTY

Highway 1

— Bridge work in Fort Bragg at Hare Creek continues. One-way traffic control will be in effect from 8 p.m. to 7 a.m. weeknights. Motorists should expect up to 10-minute delays.

Highway 20

— Road work near Road 10 continues. One-way traffic control will be in effect from 6 a.m. to 6 p.m. weekdays. Motorists should anticipate up to 15-minute delays.

— Utility work east of James Creek to west of Three Chop Road will conclude on Friday, Sept. 30. One-way traffic control will be in effect from 7 a.m. to 5 p.m. weekdays. Motorists should expect up to five-minute delays.

— Construction near the North Calpella Overcrossing continues. One-way traffic control will run from 7 p.m. to 6 a.m. weeknights. Motorists should expect up to 10-minute delays.

— Road work at the Jct 20/101 Bridge will conclude on Friday, Sept. 30. A full on ramp closure will be in effect from 6 a.m. to 6 p.m. weekdays. Motorists should anticipate up to 15-minute delays.

Highway 101

— Slide removal at Pieta Creek Bridge continues. Northbound lane closures will be in effect. Motorists should anticipate up to five-minute delays.

— Bridge work at the Crawford Creek Bridge continues. One-way traffic control will be in effect from 7:00 p.m. to 7 a.m. weeknights. Motorists should expect up to five-minute delays.

— Bridge work near Henry Station Road continues. One-way traffic control will be in effect from 6 p.m. to 7 a.m. Motorists should expect up to 10-minute delays.

— Road work continues in Ukiah at Route 222. Lane closures will be in effect from 6:30 a.m. to 6 p.m. weekdays. Motorists should expect minor slowdowns through the area.

— Fence work in Ukiah at the East Perkins Street Overcrossing continues. Lane closures will be in effect from 6:30 a.m. to 6 p.m. weekdays. Motorists should expect minor slowdowns through the area.

— Bridge work in Ukiah from the Presswood Overhead Bridge to the Hensley Creek Undercrossing continues. Lane Closures will be in effect from 7 p.m. to 7 a.m. Motorists should expect minor slowdowns through the area.

— Bridge work in Ukiah at the North State Street Undercrossing will conclude. A full northbound ramp closure will be in effect overnight from 7 p.m. to 7 a.m. Motorists should use an alternative route.

— Road work in Calpella at Route 20 continues. A full closure of the northbound offramp will be in effect from 7 p.m. to 6 a.m. weeknights. Motorists should expect up to 10-minute delays.

— Road work in Redwood Valley from Uva Drive to Ridgewood Ranch Road will conclude on Friday, Sept. 30. One-way traffic control will be in effect from 7 p.m to 6 a.m. weeknights. Motorists should expect up to five-minute delays.

— Road work south of Willits continues. Lane closures will be in effect from 6 a.m. to 6 p.m. Motorists should expect minor slowdowns in the area.

— Southbound work along the Willits Bypass will occur. A lane closure will be in effect. Expect minor slowdowns.

— Culvert work north of Willits from Big Trails Drive to Ryan Creek Road will begin on Monday, Oct. 3. continues. Lane closures will be in effect from 7 a.m. to 3 p.m. weekdays. Motorists should expect up to 10-minute delays.

Highway 162

— Bridge work at Crawford Creek continues. One-way traffic control will be in effect from 6 a.m. to 7 p.m. Motorists should expect up to 10-minute delays.

— Road work south of Dos Rios near the Rodeo Creek Bridge continues. One-way traffic control will be in effect from 3 p.m. to 7 a.m. weeknights. Motorists should expect up to 10-minute delays.

Highway 175

— Utility work in Hopland near Harrison Street will begin on Monday, Oct. 3. One-way traffic control will be in effect from 8 p.m. to 10 a.m. Motorists should expect up to five-minute delays.

Highway 271

— Culvert work near Piercy south of Bear Pen Road to north of Exit 627 continues. Lane closures will be in effect from 6 a.m. to 6 p.m. weekdays. Motorists should expect up to five-minute delays.

DEL NORTE COUNTY

Highway 101

— Bridge work on the Hunter and Panther bridges will continue. One-way traffic control will be in effect from 10 a.m. to 5 p.m. Motorists should anticipate 10-minute delays.

— Construction in the Last Chance Grade area will continue. One-way traffic control will be in effect. Motorists should anticipate 25-minute delays at all hours.

— Emergency work just south of Crescent City will continue. Lane closures will be in effect weekdays from 6 a.m.to 5 p.m. Motorists should anticipate minor traffic slowdowns.

— Roadway excavation from Parkway Drive to Wilson & Burtchell will continue. Lane closures will be in effect weekdays from 7 a.m.to 7 p.m. Motorists should anticipate minor traffic slowdowns.

— Utility work near Dr. Fine Bridge will continue. One-way traffic control will be in effect weekdays from 8 a.m. to 5 p.m. Motorists should anticipate 10-minute delays.

Highway 199

— Construction work near Kings Valley Road will continue. One-way traffic control will be in effect from 8 a.m. to 7 p.m. weekdays. Motorists should anticipate 10-minute delays.

— Culvert work between Monkey Creek Road and Oregon Mountain Road will continue. One-way traffic control will be in effect from 6 a.m. to 8 p.m. Motorists should anticipate 10-minute delays.

HUMBOLDT COUNTY

Highway 36

— Construction work from Johnson Lane to Hely Creek Bridge will continue. One-way traffic control will be in effect from 6 a.m. to 8 p.m. Motorists should anticipate up to 10-minute delays.

— Slide removal from Bar W Road to Bridgeville Road will continue. One-way traffic control will be in effect weekdays from 6 a.m. to 6 p.m. Motorists should anticipate up to 10-minute delays.

— Bridge work south of Phillipsville will continue. Lane closures will be in effect weekdays. Motorists should anticipate minor traffic slowdowns. A northbound onramp closure will also be in effect. Motorists should use an alternate route.

— Bridge work near Myers Flat will continue. Lane closures will be in effect weekdays from 6 a.m. to 8 p.m. A full on ramp closure will be in effect. Motorists should anticipate minor traffic slowdowns.

— Utility work at the Twelfth Street Overcrossing will conclude on the morning of Saturday, Oct. 1. Lane closures will be in effect between 8 p.m. and 6 a.m. Motorists should anticipate minor traffic slowdowns.

— Construction and paving work from Murray Road Overcrossing to Georgia Pacific Road will continue. One-way traffic control and lane closures will be in effect weekdays from 6 a.m. to 8 p.m. Motorists should anticipate 10-minute delays. Full on and off ramp closures will be in effect weekdays from 5 a.m. to 8 p.m. at the following locations: Route 299/101 Interchange, all southbound on and off ramps weekdays from 9 p.m. to 5 a.m. North Central Avenue Undercrossing, all on and off ramps on Oct. 6 and 7. Crannel Road Overcrossing, all on and off ramps on Oct. 6 and 7. Westhaven Drive Undercrossing, southbound on ramp and northbound off ramp on Oct. 5 and 6. Sixth Street Overcrossing, all on and off ramps on Oct. 5 and 6. Trinidad Undercrossing, all on and off ramps on Oct. 4 and 5. Seawood Drive Undercrossing Bridge, all on and off ramps through Oct. 4, after which only the northbound off ramp will remain closed. Patrick’s Point Undercrossing, all on and off ramps through Sept. 30. Motorists should follow signage and use an alternate route when necessary.

Highway 255

— Permitted utility work between Pacheco Road and Jackson Ranch Road will continue. One-way traffic control and lane closures will be in effect from 7 a.m. to 6 p.m. weekdays. Motorists should anticipate 10-minute delays.

Highway 299

— Repair work from Chezem Road to Three Creek Road will continue. Lane closures will be in effect weekdays from 7 a.m.to 8 p.m. Motorists should anticipate 10-minute delays.

— Construction from Willow Creek to Old Three Creek Road will continue. One-way traffic control will be in effect from 7 a.m. to 3:30 p.m. Motorists should anticipate 10-minute delays.

KELSEYVILLE, Calif. — Kelseyville Presbyterian Church invites the community to come shop at the church’s fall rummage sale, which will take place in early October.

The sale is scheduled for 9 a.m. to 4 p.m. Friday, Oct. 7, and 9 a.m. to 2 p.m. Saturday, Oct. 8, in the Fellowship Hall.

This year’s event will feature kitchen iems, household decor, toys, games, small furniture, bedding, outdoor items, costumes, baskets and purses.

Kelseyville Presbyterian Church is located at 5340 Third St., a block off of Main Street.

NORTH‌‌ ‌‌COAST, ‌‌ ‌‌Calif. —‌ Caltrans‌‌ ‌‌reports‌‌ ‌‌that‌‌ ‌‌the‌‌ ‌‌following‌‌ ‌‌road‌‌ ‌‌projects‌‌ ‌‌will‌‌ ‌‌be‌‌ ‌‌taking‌‌ ‌‌place‌‌ ‌‌around‌‌ ‌‌the‌‌ ‌‌North‌‌ ‌‌Coast‌‌ ‌‌during‌‌ ‌‌the‌‌ ‌‌coming‌‌ ‌‌week. ‌‌ ‌‌‌ ‌
‌‌‌ ‌
Included‌‌ ‌‌are‌‌ ‌‌Mendocino‌‌ ‌‌County‌‌ ‌‌projects‌‌ ‌‌that‌‌ ‌‌may‌‌ ‌‌impact‌‌ ‌‌Lake‌‌ ‌‌County‌‌ ‌‌commuters, as well as work in Del Norte and Humboldt counties.
‌‌‌ ‌
Caltrans‌‌ ‌‌advises‌‌ ‌‌motorists‌‌ ‌‌to‌‌ ‌‌drive‌‌ ‌‌with‌‌ ‌‌caution‌‌ ‌‌when‌‌ ‌‌approaching‌‌ ‌‌work‌‌ ‌‌areas‌‌ ‌‌and‌‌ ‌‌to‌‌ ‌‌be‌‌ ‌‌‌prepared‌‌ ‌‌to‌‌ ‌‌stop‌‌ ‌‌at‌‌ ‌‌traffic‌‌ ‌‌control‌‌ ‌‌stations. ‌‌ ‌‌‌ ‌
‌‌‌ ‌
The‌‌ ‌‌Caltrans‌‌ ‌‌Traffic‌‌ ‌‌Operations‌‌ ‌‌Office‌‌ ‌‌has‌‌ ‌‌reviewed‌‌ ‌‌each‌‌ ‌‌project‌‌ ‌‌and‌‌ ‌‌determined‌‌ ‌‌that‌‌ ‌‌individual‌‌ ‌‌‌project‌‌ ‌‌delays‌‌ ‌‌are‌‌ ‌‌expected‌‌ ‌‌to‌‌ ‌‌be‌‌ ‌‌less‌‌ ‌‌than‌‌ ‌‌the‌‌ ‌‌statewide‌‌ ‌‌policy‌‌ ‌‌maximum‌‌ ‌‌of‌‌ ‌‌30‌‌ ‌‌minutes‌‌ ‌‌unless‌‌ ‌‌‌ ‌
noted‌‌ ‌‌otherwise. ‌‌ ‌‌‌ ‌‌‌ ‌

For‌‌ ‌‌updates‌‌ ‌‌to‌‌ ‌‌this‌‌ ‌‌list‌‌ ‌‌check‌‌ ‌‌QuickMap‌‌ ‌‌at‌‌ ‌‌‌www.dot.ca.gov‌‌‌ or‌‌ ‌‌1-800-GAS-ROAD‌‌ ‌‌‌(1-800-427-7623). ‌‌ ‌‌‌ ‌

LAKE‌‌ ‌‌COUNTY‌‌ ‌‌‌ ‌

Highway 20

— Utility work will occur in Lucerne near Country Club Drive on Monday, Sept. 26. One-way traffic control will be in effect from 7:30 a.m. to 4 p.m. and motorists should expect up to five-minute delays.

Highway 29

— Road work in Kelseyville near Bell Hill Road continues. One-way traffic control will be in effect weeknights from 7 p.m. to 6 a.m. Motorists should anticipate up to 10-minute delays.

— Bridge work at Robinson Rancheria Road continues. One-way traffic control will be in effect. Motorists should anticipate up to 10-minute delays.

Highway 175

— Bridge work in Cobb at Estates Drive will continue. One-way traffic control will be in effect from 6 a.m. to 6 p.m. Motorists should expect up to 10-minute delays.

MENDOCINO COUNTY

Highway 1

— Tree work will occur in Little River near Gordon Lane on Thursday, Sept. 29. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to five-minute delays.

— Bridge work in Fort Bragg at Hare Creek will begin on Tuesday, Sept. 27. One-way traffic control will be in effect from 8 p.m. to 7 a.m. weeknights. Motorists should expect up to 10-minute delays.

Highway 20

— Road work from west of Road 10 to James Creek continues. One-way traffic control will be in effect from 6 a.m. to 6 p.m. weekdays. Motorists should anticipate up to 15-minute delays.

— Utility work will begin east of James Creek to west of Three Chop Road on Wednesday, Sept. 28. One-way traffic control will be in effect from 7 a.m. to 5 p.m. weekdays. Motorists should expect up to five-minute delays.

— Construction near the North Calpella Overcrossing continues. One-way traffic control will run from 7 p.m. to 6 a.m. weeknights. Motorists should expect up to 10-minute delays.

— Road work at the Jct 20/101 Bridge will begin on Friday, Sept. 23. A full on ramp closure will be in effect from 6 a.m. to 6 p.m. weekdays. Motorists should anticipate up to 15-minute delays.

Highway 101

— Slide removal at Pieta Creek Bridge continues. Northbound lane closures will be in effect. Motorists should anticipate up to five-minute delays.

— Bridge work at the Crawford Creek Bridge continues. One-way traffic control will be in effect from 7 p.m. to 7 a.m. weeknights. Motorists should expect up to five-minute delays.

— Bridge work near Henry Station Road continues. One-way traffic control will be in effect from 6 p.m. to 7 a.m. Motorists should expect up to 10-minute delays.

— Road work continues in Ukiah at Route 222. Lane closures will be in effect from 6:30 a.m. to 6:00 p.m. weekdays. Motorists should expect minor slowdowns through the area.

— Fence work in Ukiah at the East Perkins Street Overcrossing continues. Lane closures will be in effect from 6:30 a.m. to 6:00 p.m. weekdays. Motorists should expect minor slowdowns through the area.

— Bridge work in Ukiah from the Presswood Overhead Bridge to the Hensley Creek Undercrossing continues. Lane Closures will be in effect from 7 p.m. to 7 a.m. Motorists should expect minor slowdowns through the area.

— Bridge work in Ukiah at the North State Street Undercrossing will conclude. A full northbound ramp closure will be in effect overnight from 7 p.m. to 7 a.m. Motorists should use an alternative route.

— Road work in Calpella at Route 20 continues. A full closure of the northbound offramp will be in effect from 7 p.m. to 6 a.m. weeknights. Motorists should expect up to 10-minute delays.

— Road work in Redwood Valley from Uva Drive to Ridgewood Ranch Road will begin on Monday, Sept. 26. One-way traffic control will be in effect from 7 p.m to 6 a.m. weeknights. Motorists should expect up to five-minute delays.

— Road work south of Willits will begin on Wednesday, Sept. 21. Lane closures will be in effect from 6 a.m. to 6 p.m. weekdays. Motorists should expect minor slowdowns in the area.

— Southbound work along the Willits Bypass will occur. A lane closure will be in effect. Expect minor slowdowns.

Highway 128

— Tree work in Philo from Greenwood Road to Anderson Valley Way will occur on Tuesday, Sept. 27. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to five-minute delays.

Highway 162

— Bridge work at Crawford Creek continues. One-way traffic control will be in effect from 6 a.m. to 7 p.m. Motorists should expect up to 10-minute delays.

— Road work south of Dos Rios near the Rodeo Creek Bridge continues. One-way traffic control will be in effect from 3 p.m. to 7 a.m. weeknights. Motorists should expect up to 10-minute delays.

Highway 271

— Culvert work near Piercy south of Bear Pen Road to north of Exit 627 continues. Lane closures will be in effect from 6 a.m. to 6 p.m. weekdays. Motorists should expect up to five-minute delays.

— Road work will occur near McCoy Creek on Wednesday, Sept. 28. Lane closures will be in effect from 6 a.m. to 5 p.m. Motorists should expect up to five-minute delays.

DEL NORTE COUNTY

Highway 101

— Bridge work on the Hunter and Panther bridges will continue. One-way traffic control will be in effect from 10 a.m. to 5 p.m. Motorists should anticipate 10-minute delays.

— Construction in the Last Chance Grade area will continue. One-way traffic control will be in effect. Motorists should anticipate 25-minute delays at all hours.

— Emergency work just south of Crescent City will continue. Lane closures will be in effect weekdays from 6 a.m.to 5 p.m. Motorists should anticipate minor traffic slowdowns.

— Roadway excavation from Parkway Drive to Wilson & Burtchell will continue. Lane closures will be in effect weekdays from 7 a.m.to 7 p.m. Motorists should anticipate minor traffic slowdowns.

— Utility work near Dr. Fine Bridge will continue. One-way traffic control will be in effect weekdays from 7 a.m. to 5 p.m. Motorists should anticipate 10-minute delays.

Highway 199

— Construction work near Kings Valley Road will continue. One-way traffic control will be in effect from 8 a.m. to 7 p.m. weekdays. Motorists should anticipate 10-minute delays.

— Culvert work between Monkey Creek Road and Oregon Mountain Road will continue. One-way traffic control will be in effect from 6 a.m. to 6 p.m. Motorists should anticipate 10-minute delays.

HUMBOLDT COUNTY

Highway 36

— Construction work from Johnson Lane to Hely Creek Bridge will continue. One-way traffic control will be in effect from 6 a.m. to 8 p.m. Motorists should anticipate up to 10-minute delays.

— Slide removal from Bar W Road to Bridgeville Road will continue. One-way traffic control will be in effect weekdays from 6 a.m. to 6 p.m. Motorists should anticipate up to 10-minute delays.

Highway 101

— Bridge work south of Phillipsville will continue. Lane closures will be in effect weekdays. Motorists should anticipate minor traffic slowdowns. A northbound onramp closure will also be in effect. Motorists should use an alternate route.

— Bridge work near Myers Flat will continue. Lane closures will be in effect weekdays from 6 a.m. to 8 p.m. A full on ramp closure will be in effect. Motorists should anticipate minor traffic slowdowns.

— Striping work between Stafford and Fortuna will occur on Monday, Sept. 26, and Tuesday, Sept. 27. Lane closures will be in effect weekdays between 7 a.m. and 7 p.m. Motorists should anticipate minor traffic slowdowns.

— Utility work at the Twelfth Street Overcrossing will begin on Wednesday, Sept. 28. Lane closures will be in effect between 8 p.m. and 6 a.m. Motorists should anticipate minor traffic slowdowns.

— Construction and paving work from Murray Road Overcrossing to Georgia Pacific Road will continue. One-way traffic control and lane closures will be in effect weekdays from 6 a.m. to 8 p.m. Motorists should anticipate 10-minute delays. Full on and off ramp closures will be in effect weekdays from 5 a.m. to 8 p.m. at the following locations: Route 299/101 Interchange, all southbound on and off ramps. Trinidad Undercrossing, all on and off ramps through September 23. Seawood Drive Undercrossing Bridge, all on and off ramps. Patrick’s Point Undercrossing, all on and off ramps. Motorists should follow signage and use an alternate route when necessary.

Highway 255

— Permitted utility work between Pacheco Road and Jackson Ranch Road will continue. One-way traffic control and lane closures will be in effect from 7 a.m. to 6 p.m. weekdays. Motorists should anticipate 10-minute delays.

Highway 299

— Repair work from Chezem Road to Three Creek Road will continue. Lane closures will be in effect weekdays from 7 a.m.to 8 p.m. Motorists should anticipate 10-minute delays.

— Shoulder work West of Old Three Creek Road will continue. Lane closures will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate minor traffic slowdowns.

— Construction from Willow Creek to Old Three Creek Road will continue. One-way traffic control will be in effect from 7 a.m. to 3:30 p.m. Motorists should anticipate 10-minute delays.

LCNews

Responsible local journalism on the shores of Clear Lake.

 

Memberships: